top of page
Shifting Assets
Springwater Trail, Portland, OR 2000-2002
A former RR line and industrial zone transformed into river way.

The north site is large in scale and addresses the industrial history of the area.

A Portland Parks and Recreation and Metro Project. This 3.5 mile section of the Springwater Trail connects with the south end of the Eastbank Esplanade. Shifting Assets is a site specific installation consists of several "stopping places" along the 3.5 miles trail.


Layers of light, water and time
South Site in Oaks Bottom Nature Refuge




bottom of page