top of page

Shifting Assets

Springwater Trail, Portland, OR  2000-2002

A former RR line and industrial zone transformed into river way.

Shifting.N.overview copy.jpg

The north site is large in scale and addresses the industrial history of the area.

A Portland Parks and Recreation and Metro Project. This 3.5 mile section of the Springwater Trail connects with the south end of the Eastbank Esplanade. Shifting Assets is a site specific installation consists of several "stopping places" along the 3.5 miles trail.

Layers of light, water and time

South Site in Oaks Bottom Nature Refuge

bottom of page